PROJECT · TRANSPORT PLANNING

Lagos Quality Bus Corridor — STMP Phase 1

A key urban transport initiative connecting major routes into the existing Lagos BRT network.

Ojuelegba corridor and flyover from the air

CLIENT

Lagos State / LAMATA

LOCATION

Lagos metropolitan area

PROGRAMME

Strategic Transport Master Plan, Phase 1

STATUS

Delivered

A network is only as good as what feeds it.

The Quality Bus Corridor extends the reach of the existing BRT network by upgrading the routes that connect into it, rather than building another standalone spine.

It sits inside Phase 1 of the Strategic Transport Master Plan, which means the corridor priorities were argued from the same demand model as the rest of the network.

Iyana Iba bus terminal and depot from the air

Our role

01

Corridor selection

Ranking candidate corridors by demand and by their contribution to the wider network.

02

Quality bus design

Priority treatment, stop design and interchange arrangements into the BRT spine.

03

Implementation planning

Phasing and delivery sequencing within the master plan programme.