PROJECT · TRANSPORT PLANNING

Rehabilitation of BRT Lite Lanes: Rigid Pavement, Mile 12 – CMS, Phases 1 & 2

Reconstructing the busiest bus corridor in the country in rigid pavement, without closing it.

BRT platform with articulated buses

CLIENT

Lagos State Government

LOCATION

Mile 12 – CMS corridor, Lagos

SCALE

22 km corridor · rigid pavement

STATUS

Completed in two phases

A bus lane carrying an articulated vehicle every ninety seconds is a pavement problem.

The original BRT Lite lanes were built in flexible pavement and, under sustained heavy axle loading in a high water table, deteriorated faster than a conventional road would.

Reconstruction in rigid pavement was delivered in two phases along the Mile 12 to CMS spine, with the corridor kept in service throughout.

Bus rapid transit station and busway

Our role

01

Pavement investigation

Condition survey, coring and subgrade assessment to establish the failure mechanism.

02

Rigid pavement design

Concrete pavement design for sustained high axle loading and a high water table.

03

Staging and traffic management

Phasing that kept BRT services running through construction.

04

Construction supervision

Full-time supervision, concrete quality control and certification.