PROJECT · TRANSPORTATION & HIGHWAY

Lagos–Calabar Coastal Highway — Lagos Section

Technical adviser to the Federal Ministry of Works on the Lagos section of the largest road programme Nigeria has attempted — 700km of coastal highway across nine states, with a rail line in the median.

Lagos–Calabar Coastal Highway under construction along the Atlantic shore

CLIENT

Federal Ministry of Works

OUR ROLE

Technical adviser & engineering consultant

LAGOS SECTION

Section 1 · 47.47km from Ahmadu Bello Way, Victoria Island

CONTRACTOR

Hitech Construction Company

700 km

Full corridor, nine coastal states

47.47 km

Section 1, Lagos

2 × 5

Lanes, concrete pavement

Nigeria's largest road programme, and the first stretch of it runs through Lagos.

The Lagos–Calabar Coastal Highway runs roughly 700 kilometres across nine coastal states as a concrete dual carriageway, five lanes in each direction, elevated to withstand a fifty-year flood cycle. Section 1 covers 47.47 kilometres in Lagos, running east from Ahmadu Bello Way on Victoria Island.

We act for the Federal Ministry of Works on the Lagos section — the hydrological and hydraulic case for the corridor, the service lane design, and the technical work that comes with building a highway through settled communities.

Design overlay of the coastal highway at a junction

Our role

01

Hydrological and hydraulic assessment

Pre-construction hydrological study and hydraulic design, mapping every outfall to the lagoon — existing and yet to be constructed — before the first embankment was raised.

02

Flooding technical evaluation

Establishing on engineering evidence the causes of flooding in adjoining communities, and the corridor's effect on the receiving drainage network.

03

Service lane design

Service roads on both flanks carrying secondary collector drains, re-routing stormwater from tenements to the nearest completed outfall.

04

Register of affected structures

Field survey of 147 structures along the service lane corridor — 97 on the northern flank, 50 on the southern — from Oniru to Okun Ajah.

05

Stakeholder briefing

Preparing the Ministry's technical position for affected communities, on the evidence rather than on perception.

Corridor length, section length, lane configuration and contractor: Federal Ministry of Works, reported by Construction Review Online and Daily Trust, 2025–2026. Scope and structure counts: AEC project records prepared for the Federal Ministry of Works, July–August 2026.