PROJECT · URBAN RAIL

Lagos Rail Mass Transit — Greenline, Phase 1A

Twenty-three kilometres of new railway along the Lekki corridor: line, stations, depot and the systems that run them.

Cutaway rendering of a Green Line elevated station

CLIENT

MOFI / LAMATA, Lagos State

OUR ROLE

Owner's Engineer (consortium)

ALIGNMENT

Lekki Phase 1 (Stn 3) to Sangotedo (Stn 9) K7+327 to K30+500

SYSTEMS

Signalling, communications and power supply

23.17 km

Phase 1A route length

7

Stations in Phase 1A

≈68 km

Full Green Line, Marina–Lekki FZ

The Lekki corridor was built for cars. Phase 1A is the argument that it does not have to stay that way.

The Greenline is the rail spine for the Lekki axis, running from Marina out to the Lekki Free Zone at full extent. Phase 1A covers 23.17 kilometres and seven stations between Lekki Phase 1 and Sangotedo.

Off-line civil engineering spans subgrade, bridges and stations. On-line works cover track laying and the mechanical and electrical installation. As Owner's Engineer we sit on the client side of that, in consortium.

City at night, instrumented and lit

Our role

01

Design review

Reviewing the contractor's design for line, stations, depot and systems against the employer's requirements.

02

Civil works supervision

Subgrade, bridges and station structures across the off-line scope.

03

Track and systems

Track laying, signalling, communications and power supply installation oversight.

04

Depot and stabling

Depot layout, stabling and maintenance facility review.

05

Programme and interface

Managing the interfaces between civil, systems and rolling stock workstreams.

Full Green Line length: LAMATA. Phase 1A figures: AEC project records, via AEC Group Corporate Profile 2026.

Have a project that has to work?

Tell us the constraint you cannot design around, and we will tell you how we would approach it.

Start a conversation