PROJECT · BRIDGES & STRUCTURES

Carter Bridge Reconstruction

The decommissioning, demolition and full engineering redesign of one of the crossings Lagos cannot function without.

Carter Bridge over the Lagos Lagoon from the air

CLIENT

Lagos State Government

OUR ROLE

Engineering design & supervision consultant

SCOPE

Decommissioning, demolition & full reconstruction design

DELIVERY CONTRACTOR

CCECC

₦548.98bn

Approved replacement cost

1.93 km

New bridge length

50–100

Years design life

A city cannot take its central crossing out of service. It has to replace it anyway.

Carter Bridge is one of the three crossings between Lagos Island and the mainland. Structural fatigue on a link carrying that volume is not a maintenance question — it is a question of how you replace an asset while the city keeps using it.

The existing bridge runs 1.525 km as three lanes dualised. The replacement is designed as a modern high-capacity structure meeting international safety and engineering standards, with a flyover ramp and dual 105-metre navigational waterways beneath.

Elevated link road over a canal

Our role

01

Structural assessment

Condition and fatigue assessment establishing the case for replacement over further strengthening.

02

Reconstruction design

Full engineering redesign of the crossing to a 50–100 year design life.

03

Decommissioning and demolition

Sequencing the removal of the existing structure against the city's tolerance for lost capacity.

04

Navigational clearance

Dual 105-metre navigational waterways and the flyover ramp arrangement.

05

Construction supervision

Supervision of works delivered by CCECC.

Cost, lengths and contractor: Federal Ministry of Works announcement, reported by Premium Times and BusinessDay, 2026.