SERVICES / INFRASTRUCTURE

Water Engineering

Water supply, drainage master planning and flood mitigation for dense urban catchments.

Container ship at a deep seaport

In Lagos, drainage is not a utility. It is the difference between a road and a river.

We plan and design water supply and drainage infrastructure for cities where the water table is high, the rainfall is intense and the catchment is already built on.

Work spans catchment-wide drainage master plans, flood mitigation schemes, outfall design and water supply distribution networks.

What this involves

01

Drainage master planning

Catchment delineation, hydrological modelling and a phased drainage strategy for a whole district.

02

Flood mitigation design

Attenuation, channel improvement, pumping and outfall works sized to a defined return period.

03

Water supply schemes

Source assessment, treatment, transmission and distribution network design.

04

Hydraulic modelling

Network and surface-water modelling to test capacity under storm and growth scenarios.

05

Supervision and commissioning

Construction supervision, testing and commissioning of water and drainage assets.

Have a project that has to work?

Tell us the constraint you cannot design around, and we will tell you how we would approach it.

Start a conversation