Bus reform in Lagos is usually framed as a fleet problem. It is closer to an economics problem.
The standard version of the argument goes like this: the buses are old, the operators are informal, and if the state buys enough new vehicles the service will improve. Every part of that is true and none of it is sufficient.
The operator already has a business model
The informal operators who move most of Lagos are running a business that works. It has low fixed costs, no depot overhead, revenue collected in cash at the point of boarding, and a route structure that adapts to demand within a day. Any formal system has to either buy that model out or beat it on cost per kilometre.
What a formal BRT system offers instead is speed and predictability, and those come from the right of way, not the vehicle. A dedicated lane, priority at junctions and stations spaced for the corridor rather than the kerb are what produce a journey time a passenger can plan around.
Capacity is a junction problem
On the Mile 12 to CMS corridor, the constraint has never been the number of buses. It is how many vehicles can be discharged through the signalised junctions at each end within a cycle. Add buses without addressing that and you queue them.
This is why corridor design and traffic signal strategy have to be developed together. Treating them as separate workstreams is how a corridor ends up with capacity on the link and none at the node.
What ten million a day actually requires
A network, not a corridor. Multiple radial spines with genuine interchange, a fare structure that does not penalise transfer, and a rail backbone taking the longest trips off the road entirely. Every one of those is in the Strategic Transport Master Plan. The question was never what to build — it is the order and the funding.